Important Installation Guideline
  • Purlin distance must be 2.0 feet for 2.0 mm thickness
  • For 3.0 mm purlin distance 3.0 feet must.
  • 5 nos screw per sq. Mtr.
Who can Fix
  • Any fabricator who is doing fixing ]ob for ppgi,ppgl or non asbestos sheet iob can install. This roof sheet easily, he iust has to follow above installation guideline at the time of instantiation.
  • 5 number of self drilling screw per square meter.
  • At the time of screwing you have to make 10 mm whole for contraction and expansion of sheet.
Most Important Note
  • The white is our raw material colour the other colours are derived from pigmentation & pigment are subiect to sunlight fading.
Guarantee & Warranty
  • There is always expected life in roofing material, the warranty is not there
  • Sun-arch upvc roofing sheet expected life period is approx 10 yrs.